How we calculate the service time of buildings
No Answer is Posted For this Question
Be the First to Post Answer
what is civil all interview questions
what is stress
what isIS code no for preparation of BAR BENDING SHEDULE (BBS)
How many bag of cement used in all type of RCC
how much nails used in 1 sq m shuttering
16 Answers L&T, Pearls, Simplex,
How we paste the Granite Slabs at External Wall?Is there any chemical compound material was using?
What is the concepts of buoyancy & effect of weight distribution on floating bodies?
what is the procedure for flakiness and elongation index
what are the mixing of M10,M15,M20,M25,M30grades?
Onsite percentage wastage of Concrete, Rebar, Blockwork/Brickwork, Plaster, Floor tiles ??
What height of a 3.5 m high 300 x300 mm proposed col. can be casted at a time ?
if i used salt as a add mixture in concrete, then what will happen and what are the naturally available add mixtures.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)