1. How do you handle non-productive team members?
Answers were Sorted based on User's Feedback
Answer / bala
*Need more information.
1.R u on their side like one of the team member, r
2.R u the one to lead them, r
3.R they opponent 2 u (like Site.Eng Vs QC.Eng ).
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / m.a.muqtadar
1. Trained them
2. Encourage them
3. Supervise them
4 Keep him under observation of a skilled foreman
5. Be committed to them.
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / venkata appa rao
I am tackling this question as if your are the team lead.
1. Asses his strengths and weaknesses.
2. Asses his present condition is due to demotivation, lack of motivation or inadequate motivation?
3. Is he not able to fit into this team or there is a temporary slump in his Performance.
4. sit with him and counsel him about his performance or lack of it.
5. If after all this he does not come up in performance change his duties after ascertaining about his aptitude.
6. Counsel him as to how and why of his present inadequate performance.
Is This Answer Correct ? | 1 Yes | 0 No |
1.we have to observe them initially 2 test their grasping
power 3 explain them n number of times ask and enquire where
they are lagging behind 4 give ample of time 5 finally
insist them to do lastly maintain principle perform or perish
6 telling him he will be rewarded for his work and deication
Is This Answer Correct ? | 0 Yes | 0 No |
Did you handle any interior designing jobs?
The corrosion resistance of a material is.
do you think we shall remove un wanted soil for foundation excavation even if the thickness of the soil strata is more than 8m ?
Whats the size cube
2 Answers Shimla Hills Construction,
what is the full form of following sueface type of road - AC,CC,(PM,DM,SB),(CG,Ma,Me), G,E,O
formula of calculation of weight of steel bars
If your drg told used 600 dia hume pipe for culvert but due to market problem available 300 dia hume pipe,den how much humepipe you provide(300 dia) instead of 600 dia?
How to calculate compressive strength of concrete?
Target strength = fck +(1.65*4) What is this 4
what is the relation between pitch of steel and depth of slab?
what is density on steel bars?
Whats maxi. slump of M-7.5 Concreit for PCC
2 Answers Indiabulls, Swastik Group,