1. How do you handle non-productive team members?
Answers were Sorted based on User's Feedback
Answer / bala
*Need more information.
1.R u on their side like one of the team member, r
2.R u the one to lead them, r
3.R they opponent 2 u (like Site.Eng Vs QC.Eng ).
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / m.a.muqtadar
1. Trained them
2. Encourage them
3. Supervise them
4 Keep him under observation of a skilled foreman
5. Be committed to them.
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / venkata appa rao
I am tackling this question as if your are the team lead.
1. Asses his strengths and weaknesses.
2. Asses his present condition is due to demotivation, lack of motivation or inadequate motivation?
3. Is he not able to fit into this team or there is a temporary slump in his Performance.
4. sit with him and counsel him about his performance or lack of it.
5. If after all this he does not come up in performance change his duties after ascertaining about his aptitude.
6. Counsel him as to how and why of his present inadequate performance.
| Is This Answer Correct ? | 1 Yes | 0 No |
1.we have to observe them initially 2 test their grasping
power 3 explain them n number of times ask and enquire where
they are lagging behind 4 give ample of time 5 finally
insist them to do lastly maintain principle perform or perish
6 telling him he will be rewarded for his work and deication
| Is This Answer Correct ? | 0 Yes | 0 No |
What"s mean by term of BOQ in construction?
13 Answers Jaypee, Shaarc Projects, Xerox,
fe415
In case of columns the cover is from main steel or from stirrup & which is the IS code mentioned in it?
How to convert rainforcement calculation: Running meter to kg
23 Answers Interscape, Pratibha Industries,
what is the lap length for pile reinforcement cage in water piling
10 sq m ,25mm thickness 1:2:4 cement and concrete floor how much cement required? 2 , if truck has a capcacity of 8 ton then how many bricks we can put on it ?
what is the least count of Total station
how much is the maximum compressive strength of soil cement and soil-cement-microsilica .
how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?
what is the full form of following sueface type of road - AC,CC,(PM,DM,SB),(CG,Ma,Me), G,E,O
What is the strongest bridge for a school contest?
what is the minimum and maximum thickness of plaster.?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)