1. How do you handle non-productive team members?

Answer Posted / m.a.muqtadar

1. Trained them
2. Encourage them
3. Supervise them
4 Keep him under observation of a skilled foreman
5. Be committed to them.

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

For Granite Flooring,For Cement Slurry purpose which one is effective of cost control whether OPC or PPC or White cement?

1493


what is constat for brickwork

1691


I need Bhel engineertrainy test papers in civil engineering please send to email id - hisandy66@gmail.com

1855


WHAT WII BE THE WATER ABSORPTION POWER OF WOOD ?

1785


Define What are the uses of Groynes?

733






I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.

2058


what is thumb rule for calculating the size of ISMB required for a particular length of span

2959


Can inverted beams used in pipes during construction?

874


why the openings of sieves are square io size?

1099


how the calculation occurs if i want to mix 1cum of M50 concrete. please calculate every ingredients with detail calculation.

1665


what is smart building materials?

1591


Define What is aggregate?

704


In cement concrete how to check a quality of material also proportion of material at site ?

1436


Hollow block masonry in cement mortar 1:4, 40×20×20cms in superstructure take 10sqm.I want calculation of brick sand

1266


What is kn measurement?

744