Answer Posted / bala
*Need more information.
1.R u on their side like one of the team member, r
2.R u the one to lead them, r
3.R they opponent 2 u (like Site.Eng Vs QC.Eng ).
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
Formula for calculating the volume of bulb in underreamed pile
does a b.tech civil engineer fresher supposed to know how to design rcc structure?
how to calculate testing date
what r the precaution for high in atp tempareture,low in atp tempareture
RR masonry rate analysis
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
how many tonnes equals to one cubic feet?
Which IS Code/American Code applied for coupler test of steel
how to calculate the mortar for 10'*10' size room for both plastering and for masonry work?
at which depth the construction of tunnel is economical from cost and engineering aspect.
difference between fc and fc'?
In the design of bridge arguments what considerations should be made to select the orientation of the wing walls?
How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?
What are the reasons for geotechnical site investigations in uganda?