in steel bar weight formula (d^2/162).so what is 162.
Answers were Sorted based on User's Feedback
for 1 m length steel rod
I ts volume V =(Pi/4)*Dia x Dia X L
=(3.14/4)x D x D X 1 (for 1 m length)
Density of Steel=7850 kg/ cub meter
Weight = Volume x Density
=(3.14/4)x D x D X 1 x7850 (if D is in mm )
So = ((3.14/4)x D x D X 1 x7850)/(1000x1000)
= DxD/162.27
| Is This Answer Correct ? | 187 Yes | 25 No |
Answer / bhanu seshagiri
Derivation of Constant 162:
dead weight of steel is 7850 kg/cum
formula
(area of bar) x (1 meter of bar) = volume of bar
(3.14/4 x d/1000 x d/1000) x 1 meter = volume of bar
(0.000000785 x d x d)cum (dia. convert to meter)
1 cum of steel is 7850 kg
so (0.0000007845 x d x d) cum of steel bar is
(0.000000785 x d x d) x 7850 =0.006162 x d x d = d x d /162 (1/0.006162 = 162)
| Is This Answer Correct ? | 18 Yes | 2 No |
Answer / ankit panchal
Weight of bar = d^2/162 x lenghth of barfor 1000 mm (1 meter) length Reinforcement rod
Weight = Volume X Density
Weight = (Area x Length) X Density
Weight = ( Pi/4 x d^2 x Length) X Density
= (3.14/4 x d^2 x 1000) X 7850
Density of steel is in Kg/m^3 & Length is in MM
So Lets Convert Density of steel KG/m^3 to MM (7850 / 1000x1000x1000 (i.e. m^3) )
= (0.785 x d^2x1000) X 0.00000785
= d^2 x 0.00616225
Lets assume 1
= d^2/1 x 0.00616225/1
Let reverse
= d^2 / 1 / 0.00616225
= d^2 / 162.278
Say d^2 / 162
| Is This Answer Correct ? | 9 Yes | 2 No |
162 is spacific gravity
d^2 is area for 1 mtr
| Is This Answer Correct ? | 17 Yes | 35 No |
Why provide strripus in a column minimum and maximum spacing.
how many numbers of Precast concrete hollow blocks (400mmx200mmx200mm) can be installed by the one mason and two helper in one day.
how much cement is contained in 1:5 ratio 4" brickwork for 1 sqft
What are causes of cracks in outside plaster of a building and how we prevent it during constructions?
Whta is the proportion of M30
how to calculate quantity of cement,sand & aggregate for u.c.r / r.r masonry in cm 1:6
On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??
what is the design procedure for building
Manpower required for de shuttering of conccrete slab
Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?
how many types of admixters are used for C.C. Road works
1 Answers CADS Software, IVRCL, PSK,
what are the criteria for choosing the span for the bridge (highway bridge)
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)