Answer Posted / sivaramkrishna
1.we have to observe them initially 2 test their grasping
power 3 explain them n number of times ask and enquire where
they are lagging behind 4 give ample of time 5 finally
insist them to do lastly maintain principle perform or perish
6 telling him he will be rewarded for his work and deication
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
how to check and keep control on the wastage of material at site
Define the various stages of the project planning process in construction.
HOE TO YOU PLAN TO ACCHIEVE THE GOALS?
what is the formula to find the sttel (bar)length in beam having bent up at l/4 t 45 degree & 60 degree.
please what are the required bars for a beams of 6mx6m and 450x300mm, one is continuous and the the second is discontinuous ..Its a commercial building (church)
150mm bricks size how many use 4.14 m3
strength vs shape factor
What is the difference between Grade I, II and III of GSB?
what is the list of building construction equipment & teir output?
what's the formula for calculate pcc for matt(45mm aggregate)?
What is the use of offset command?
What is soil enforcement?
Soil bearing capacity formula
how much to get of BRC lapping in full yield and half yield ?
How we calculate the service time of buildings