Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


HOW TO CALCULATE LABOUR COST FOR CONCRETE WORK PER CUBIC
METER.

Answers were Sorted based on User's Feedback



HOW TO CALCULATE LABOUR COST FOR CONCRETE WORK PER CUBIC METER...

Answer / sjtbehera

For M20 Grade conc.

Head mason - .05 x Rs 200 = Rs 10.00
Mason - .3 x Rs 190 = Rs 57.00
Labour - 2.5 x Rs 90 = Rs 225
______________________________________
Total amount - Rs 292.00

Add 1% for watering

This is the only Labour cost of RCC not Machinary and
pouring

Is This Answer Correct ?    51 Yes 35 No

HOW TO CALCULATE LABOUR COST FOR CONCRETE WORK PER CUBIC METER...

Answer / naresh

.95 m/m, .68 f/m, .27 bh, .05 first class mason, .05 second
class mason, .04 mason assistant for upto 2nd floor

Is This Answer Correct ?    22 Yes 10 No

HOW TO CALCULATE LABOUR COST FOR CONCRETE WORK PER CUBIC METER...

Answer / dushyant bansal

for the rates of all labours, masssons etc we have to check
the rates from the schedule of retes of that area

Is This Answer Correct ?    11 Yes 4 No

HOW TO CALCULATE LABOUR COST FOR CONCRETE WORK PER CUBIC METER...

Answer / geethu

can u explain ? Head mason - .05 x Rs 200 = Rs 10.00
Mason - .3 x Rs 190 = Rs 57.00
Labour - 2.5 x Rs 90 = Rs 225 ? wht"s mean by 0.05?

Is This Answer Correct ?    24 Yes 18 No

HOW TO CALCULATE LABOUR COST FOR CONCRETE WORK PER CUBIC METER...

Answer / sjtbehera

Please tell me How many Cum can do a mason. if you know
then .05 can easily you can find, are you a civil engineer

Is This Answer Correct ?    14 Yes 9 No

HOW TO CALCULATE LABOUR COST FOR CONCRETE WORK PER CUBIC METER...

Answer / santhoshselvamani

0.5 masons means
half mason charge of the day/shift
same like supervison charges

Is This Answer Correct ?    8 Yes 3 No

HOW TO CALCULATE LABOUR COST FOR CONCRETE WORK PER CUBIC METER...

Answer / rocky

YES

Is This Answer Correct ?    2 Yes 2 No

HOW TO CALCULATE LABOUR COST FOR CONCRETE WORK PER CUBIC METER...

Answer / praman kr srivastava

Mistry I No 0.200

Beldar Nos 3.000

Bhisti No 0.900
Sundries L.S 5.500

Is This Answer Correct ?    5 Yes 7 No

Post New Answer

More Civil Engineering Interview Questions

Is there any codal provision for the use of Micro Silica in concrete?

0 Answers   GIL, SPCL,


What is Aggrgate sizes used in a WMM Plant?

3 Answers   Black Stone,


what is means of M50,M20,M15 like this please tell me ?

0 Answers  


 Which Types Of Bricks ? 

0 Answers   Assotech,


what is the difference between linear and curved elements?

0 Answers   Al-Hamd Academy,


what is preposition of M-5 grade

3 Answers   Montag Infrastructure,


How many cement sand ballast in cc 1:4:8 40mm

0 Answers  


is load combination is necessary in staad pro design

3 Answers  


I'm constructing my house, now at lintel level. I need belt concrete with laft..length - 22ft, berth- 11ft, one side laft for 2ft, *22ft length. Kindly inform me centring cost only, without material cost.

0 Answers  


detailed calculation of the amount of cement used?

0 Answers  


pl.may i place dry mix in casting of drain bed partialy filled with water?if no pl explain.

3 Answers   KMC,


what does '415' in FE415 stands for??

4 Answers   Rites,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)