HOW TO CALCULATE LABOUR COST FOR CONCRETE WORK PER CUBIC
METER.

Answer Posted / dushyant bansal

for the rates of all labours, masssons etc we have to check
the rates from the schedule of retes of that area

Is This Answer Correct ?    11 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

explain what do you mean by the property development.

1639


What is the withdrawal force of steel nails?

689


What is the likely strength of a 1:2:4 concrete mix?

681


what is pile and deam foundation

1820


What Are The Different Type Of Slump Test Indications?

827






what is the procedure involved in preparing mix design of m15 grade as per IS-10262-1982

1674


What are the composition of a landfill?

693


why demand factor less then 1 ?

1779


What is command line?

701


how much of quantity of material required for execution of one cubic meter of random rubble masonry in 1:3 cement mortar

1928


Define relative co-ordinates?

703


If we have the center line of the Finnish road level and we want to know what level of pay would have offset the Lhs and Rhus RHS 1,2.5,5 1,2.5,5 m.

1557


how we can find sieve #4 is 4.75mm?

1887


weight of 1 cft 10mm, 20mm, 40mm aggregate weight of 1cft course sand

4602


what is the Asfalt test?in road constraction..?

1658