HOW TO CALCULATE LABOUR COST FOR CONCRETE WORK PER CUBIC
METER.
Answer Posted / sjtbehera
For M20 Grade conc.
Head mason - .05 x Rs 200 = Rs 10.00
Mason - .3 x Rs 190 = Rs 57.00
Labour - 2.5 x Rs 90 = Rs 225
______________________________________
Total amount - Rs 292.00
Add 1% for watering
This is the only Labour cost of RCC not Machinary and
pouring
| Is This Answer Correct ? | 51 Yes | 35 No |
Post New Answer View All Answers
types of survey and levelling instrument ?
Can you pl explain the procedure steps of singly and doubly reinforced beams in limit state method
pls give me some basic informations in construction of a structure?
step by step procedure to find out the percentage of steel in coloum,beam,slab,footing in detailed
What is absolute pressure? How absolute pressure is calculated?
How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.
why the profile of shell of natural draught cooling tower is hyperabolic.
How to calculate construction cost of residential building in mumbai
How much time Required for PPR pipe network testing
What is rate for brick masonry work of 1.0 m3 in cm 1:6?
How to build the floor to ceiling bookcase?
Difference between lime, distemper and plastic emulsion?
GIVE US YOUR FULL DETAIL OF THE FOLLOWING… FULL NAME.. PERMENENT MAILING ADDRESS DIRECT CONTACT NO E MAIL ADDRES.
if dia of inner circle is 42 m and depth is 1.5 m and width is 1 m ,then whait is the quantity of steel?
on what basis the partial factor of safety are decided? form the load combinations