what will be price of 1:2:4pcc per kg?
No Answer is Posted For this Question
Be the First to Post Answer
What are the reasons for geotechnical site investigations in uganda?
How to Calculate in measurement RCC Colo um Spred design for Billing
how much cement,sand,aggregate will use for 1 cum in ratio of 1:2:4.
16 Answers ARS, College School Exams Tests, Gulf Construction, HRL, mWorkspace, NCC, URC Construction,
how to calculate the value of 162?
2 Answers GKC Projects Limited GKCPL, L&T, OPG,
Wats the purpose of lap length? Is it for strength or increasing of span
length where bent up is made in slab of bridge from one end
why we are using 190x90x90 mm of brick size?
how to placeing reinforcement in slab?
Can anyone tell me the salary and job profile of transportation engineers/transport engineer?
What is meant by solid geometry?
why cracks develop at the upper corners of doors openings
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)