HOW TO CALCULATE LABOUR COST FOR CONCRETE WORK PER CUBIC
METER.
Answer Posted / santhoshselvamani
0.5 masons means
half mason charge of the day/shift
same like supervison charges
| Is This Answer Correct ? | 8 Yes | 3 No |
Post New Answer View All Answers
What is a tensile strength? What is the tensile strength of wood?
How to marking the building
pls tell me , what is the water content
While calculating the weight of the steel per running meter, the formula used is [(dxd)/162]. Why 162 is used in denominator & how it is derived?
What is the software used in civil engineering?
what are the challenges of being a team leader and a supervisor?
Explain what are the skills required to become an architect?
What is the Hardness of M-40 grade concrete, general and theoratical
What is the use of extend command?
what"s the sort of beams?
Which architectural movement is also known as jazz moderna?
what is tension column?
I am called for interview from north east power plant .so, I need some interview question which may help me.
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
what is the hanekom repairing material after concreting work