What r the specification furnishid in motor name plate?
Answers were Sorted based on User's Feedback
Answer / zan
they are
1 typeof connection
2 capsity
3 RpM
4 phase
5 poles
7 if induction Excitation volatage
8 DC/AC
9 manufactures name
| Is This Answer Correct ? | 4 Yes | 0 No |
Answer / ramendra shukla
The Following are specified-
1) Manufacturur Name
2) Sr. No.
3) Type of Motor-(AC/DC,1 or 3 phase induction or synch.)
4) Type of Connnection-(Y-Delta in case of 3 phase)
5) voltage,Current,Frequency(in Case of Ac)
6) Electrical Power (KW)
7) Mechanical Power (H.P.)horse power
8) Efficiency(in %)
9) Class of insulation- H,F, or C
10)RPM
11)Weight,etc.
| Is This Answer Correct ? | 4 Yes | 0 No |
Answer / amolkarne
also 10.Duty cycle (continuous/intermittent etc)
11.Class of insulation (Y/A/E/B/F/H/C)
12.Rated CURRENT ( in Amp.)
13.Rated Voltage (in Volt.)
ETC.............
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / ukansara
14. frequecy
15. Protection class
16. motor frame
17. motor weight
18. serial number
19. Torque
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / josh kiran p
The specifications mainly furnished in motor name plate are:
1.Motor rating
2.type of supply to be given
3.rated current
4.rated voltage
5.rated speed
| Is This Answer Correct ? | 1 Yes | 0 No |
how to know the diffrential relay setting of 06mva step- down (delta-star)transformer?
How do I know if a transformer is saturated? I am doing the simulation of the saturation of a transformer, but what parameter tells me when a transformer is saturated? How do you calculate? is on the plate?, there is a rule that can help me? How could model? I understand the saturation occurs when the flow can no longer bind to the other winding, this is given to certain current, this current is the same that appears as the highest in the bale of features? Thank you for your help Eduardo Alvarez Guatemala
I have two AC generators, the first rated 2680KVA for 380V/4345A/pf:0.7 and the second rated 3461KVA for 5500V/363A/pf:0.8. I want to parallel the two generator to a bus. The second generator passes through a transformer to down the voltage to 380V and a part of its power goes to another bus so that it's only a part of the total power of the second generator taht goes to the considered bus. I have two Basler DECS100 AVR regulator. How can I make the synchronization ? What others equipments must have ?
HAI,HOW TO SET THERMAL OVERLOAD RELAY FOR DOL STATRTER FEEDER AT START AND RUNNING?
Why should The rating of 11 kV DO Fuse is in mulyiple of hundred(200 Amp. 40 Amp, etc) Ampere wheareses the its fuse elemnt has rating in just few Amp (< 12 Amp)? ( Is it jusy beacuse of factor of safty).
What are the classifications of heating element?
300m long and 30kw inductive loade 3phase supply how many size cable required
Technical requirement of Copper earthing over GI earthing.
what is the difference between synchronization and paralleling?
Why SF6,VCB,Oil Ckt Breakers are use in HT Side need brief information ?
1.Why we use choke?If we use for high starting voltage then different type choke gives different voltage. Is it correct?
why full load voltage is less than no load voltage?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)