Answer / sjtbehera
you can convert either in kg or cum or cuft. does not
matter. matter is if you taken 10mm and 20mm in which
porpotion, it is either taken in 60:40 or 36:64: in 20mm
and 10mm. tehn easily claculated of cement and aggrgate.
know more visit : www.civilconstrunction1978.hpage.com
Is This Answer Correct ? | 12 Yes | 2 No |
Answer / achutharaj
we calculate the qty of cement,sand ,aggregate in cu.m,then
we multiple specific weight * qty of cement calculated =
qty in kgs
example 1:2:4
cement specific weight 1440kg/m3
cement qty in cu.m = 0.22
cement qty in kg = 0.22*1440=322kg
sand,aggregate specific weight 1840kg/m3,1550kg/m3
Is This Answer Correct ? | 7 Yes | 0 No |
Its very Simple calculate the cement, sand, 10mm, 20mm first the convert into kg. but before that you should know unit weight of materials which I uploaded in my esnip account please check them to have clear picture.... http://www.esnips.com/doc/0e0c51c2-713e-4f52-b677-d666e2fa3f1b/Material-weight
Is This Answer Correct ? | 8 Yes | 7 No |
Answer / vijay kumar jayswal,nccl
First things you want the qty. of aggregate in kg but in
which converted in kg from cum.,cft.sqft.so that given the
basic culculated of the Quantity (in Kg) of aggregete by
the bulk density of the Fine & Coarse Aggregates and weight
of cement quantity (in Kg)Culculeted by the weight of
water/water cement ratio
Is This Answer Correct ? | 5 Yes | 6 No |
how to calculate quantity of steel in a slab , coloumn and beam
1 Answers JSW, Om Sai Builders,
how can can column be corrected when the design is not safe ? is the increasing the clearcover a solution?
what is water cement ratio m10,m15,m20,m25,m30,m35,m40
1 Answers Quaid-e-Azam International Hospital,
why the horizontal crack occoured in the joint between brick work and lintel?pls. give clarification???
what are the differences between shear wall and column
4 Answers BM, L&T, University of Gondar,
to achieve the strength upto m-65 concrete what we should add a)more cement b)silica fume c)marecement with fly ash d)flyash
which tests for concrete pouring period at the site?
What is is code for use TOR
How much shuttering oil required for per m2 shuttering by 12mm ply
1m3 of brick is equal to how many cft of brick
What is the difference between nominal mix and design mix?
1)What is the total volume of aggregates required for 1cu.mtr.solid hard concrete? 2)What is total mass of wet concrte and dry concrete after 28 days of M25? 3) Is 28 days strength is the final strength of concrete or it gets increasing as the time period increses.? 4)What is the volumetric proportion of concrete grade of M25.M30,M35,M40