what is the IS code no. for concrete wastage?
Answer / murugesan mani
IS 446 i will show all of issue of concreting
| Is This Answer Correct ? | 2 Yes | 3 No |
how many men days of loburs and masons are requirete for 1 cum,pcc (1:2:4),Pcc(1:3:6) and Pcc(1:4:8) thanking you
what is mean by quality in terms of construction
why cracks are being developed in a structure? any specific reason? is there any remedial solution?
Should column area deducted from form work measurement of slab in building?
Structural steel: For a thumb rule check in field, the allowable weight which can be hung down for 10mm dia mild steel rod, of yield value of 0, 25 KN/mm2 and applying a factor of safety 2.00, will be how many kg?
How can we demolish concrete beams?
what is the diferance np3 and np4 pipe
1 Answers Sharda Construction,
how many plastr work in one bag cement
What is differences between torsion and buckling?
How to find beam R/F cutting length
Why are L-beams (cast monoloithic with slab)that usually occur at the slab edge, provided with overhangs?
For 100 bag cement how i will calculate sand and metal aggregate.Mixing proportion 1:1.49:2.38
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)