What will be the exam pattern and syllabus for j.e post of haryana staff selection commision?
Advt no. (02/2015)
Some people says it would only be objective type question papers while others say it would be same as ssc (1 objective,1 conventional) ??
Please answer this question it is needfull to all.
No Answer is Posted For this Question
Be the First to Post Answer
How do piles bear loads
whats the field test of cement,aggregate and water
What is the density of most of construction materials?
What is the cost difference between site mix and ready mix concrete per cubic meter
how to calculate quantity of steel & concrete in stair case
7 Answers Al Fara, Indu Projects, Orbit Corporation, Shree Shakti Enterprises,
What is the maximum allowable 'Silt content' in River sand
16 Answers IVRCL, Om Buildcon,
Explain what is alternate bid?
how we can find sieve #4 is 4.75mm?
What is a bearing capacity of soil?
Current ctc and expected ctc? Should i tell or as per Compnany norms? I am not fresher (1 yr exp) so how should i Face it
how do we calculate wastage of steel in the site,what r the items to taken into account for wastage calculation?
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)