Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


How do you calculate qty for form work like props shuttering
sheet and acro span for residential block ?
for Example: 10 sq mt what is the material and qty require to
do form work.

Answers were Sorted based on User's Feedback



How do you calculate qty for form work like props shuttering sheet and acro span for residential b..

Answer / narayani upadhyay

I am not sure too much about it, but it gives an idea for calculating the props , number of sheets and acrospane in a building form work.
size of ms sheet (steel sheet)= 2' * 3'=6 6sqft
props should be between 500 mm to 600 mm to each-other.
Acrospane are uses from one end to other end for supporting the ms sheet on slab.
lets assume the size of 2 BHK = 1000 sqft
=Number of sheet required =1000/6=166.67 approx=170
Add 10 to 15 % wastage=170*1.10=187
=If depth of slab less than 175 mm = 4 sheet contain 1 acrospane.
= If depth of slab more than 175 mm=5 sheet contain 1 acrospan
= lets assume depth of slab= 125 mm
= Number of acrospane= 187/4=46.75 approx=50
=number of props requred= it depend on the size of beam and length of beam around the slab.Total length of beam in running meter around the slab(incuding sunken,balcony ,ots and staircase)=70 m
=props should be between 0.5 m to 0.6 m.
=number of Props for BEAM length=70/0.6=116=approx 120
=Number of props for slab=50*2=100
= Total number of PROPS=320

Is This Answer Correct ?    26 Yes 7 No

How do you calculate qty for form work like props shuttering sheet and acro span for residential b..

Answer / thamaraikani

simple constructin material calculation:
sheet,span and props
assuming :1000sqm builtup area
step1:sheet
1000/0.9*0.6=1851nos
step2:span
note:(slab thickness less than 175=4sheet)
(slab thickness more than175=5sheet)
span=1851/5=370nos
step3:props
note:(slab thickness less than 175=4sheet/2)slab thickness less than 175=5sheet/2)
props=370*2.5=925nos

Is This Answer Correct ?    6 Yes 3 No

Post New Answer

More Civil Engineering Interview Questions

we are use us steel in PQC road

1 Answers   Student,


What are the specification of good quality sand for plaster and brickwork?

2 Answers  


why elongation index is not required for concreteing coarse aggregate..

2 Answers  


Why we use pcc in foundation?

1 Answers  


how much binding wire is required for one tone steel

20 Answers   Gammon, Hinduja, Jindal,


how many types of admixters are used for C.C. Road works

1 Answers   CADS Software, IVRCL, PSK,


which is cover of r.c.c. column,beam and slab

5 Answers   Cube, RPP,


in how much square meter of slab we are providing a beam it may be oneway or twoway slab.

1 Answers  


how we can estimate the M50 concrete for foundation?

2 Answers   Emirates, L&T,


what are the functions of wall

2 Answers   ATS, Gammon,


Can anybody explain with the help of sketeches that what are 2legged , four legged & 6legged stirrups and how to calculate cut length of diamond ring(stirrups)?

3 Answers  


beam top main reinforcement(25mm) was drilled off by mistakely when making drill hole for dummy columns. any one can give useful information for this issue or related code or websites.

3 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)