Please send me the qunty. of mason/labour required in each
day for different type of civil construction work?please
send me ans. in my mail.my mail id is
(parthamitra086@gmail.com) or here.
No Answer is Posted For this Question
Be the First to Post Answer
Sunk slab means what ?
Tell me about Construction, Contraction and Expansion joints...
2 Answers Modi Builders, SMCC,
What is the difference between Backfilling & Refilling in Earth Work Group Item ?
Hi, Please tell me the ISI specification for the duration of concrete to achieve full strength of concrete. Is it 28days?
How many cover blocks should be provided for 10 sq.m area?
indiploma civil engineering student r studied is456-1978. but in practicial we r using 2000 version i think 1978 version didn't use the student. any openion?
what is the venturi effect in buildings? what is green house concept?different types of dams? which dam is economical arch dam or gravity dam. what are the conditions favourible to both of them?
what is meant by velocity & gravity ?what is the difference between normal liquid flow & gravity liquid flow ?
what is mean by tremie concrete
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
How can you achieve soil enforcement?
how much bentonite powder mix in 1000ltr fresh water with detail.