Can we inject more current in ct primary paralleling 2 loading transformers/Injection kit at a time?let ct ratio be (5000/1A)(per kit rating 2000A range),i need to inject 5000A,if this cant b done means wat is d optional?
1 4499How can we calculate strength of copper hich is supplying electric power to heater and in it hold the heater also and what r all types of forces which is acting on it...
ABB,
1981How Much Capacity of Diesel Genset is suitable for 20 no.s of 1.5ton AC's & Why?(Load Calculation)
11 36502how to calculate the powerfactor in induction motor having name plate details? for example 1 h.p motor 1.86 A 415 V
6 20937Post New Electrical Engineering Questions
how to setting voltage RTCC panel
What is difference between unity power factor wattmeter and upper power factor wattmeter? In short circuit test of transformer the wattmeter used is unity power factor type or upper power factor type wattmeter?
why constant voltage transformer should be start without load? and if started then what will happen?
why burdens of VTs is more than CTs?
What is the dc grounding system and what is diff between AC/DC grounding system?
If I want to connect a capacitor bank on the HT side of a 11kV/415V, 3 phase delta-star distribution transformer to supply Reactive power to it..what practical specifications of a Capacitor bank that can i've??please reply..
Can any body tell gulf interview question for experienced electrical engineer ?
How much costly in percentage wise is sandwich busduct costly than air insulated busduct of any rating?
iam working in power plant. In hot places tube lights are glowing at the end portion only. what is the reason for that?
If I want to lift the water at a height 50m from ground level through two inch(diameter) metal pipe then what is the capacity of motor pump is required? is it possible in single phase supply or not?
volts=230 c=10mf a=??
What is Anemometer used to measure?
if the motor rated speed is 950rpm. how to change the above rated speed? is it possible?
In our factory so many iron pillors are exists for supporting the shed/Hangar. If do more no of earthings at one piller instead of doing more earth pits in many locations and running earth strip around the hanger, I can save the money. Please suggest this method is acceptable as per Is specifications though the Earth resitance of the farthest piller is with in the limits as per IS specifications.
what's the difference between abs/inc encoders. apart from the position remembrance what are all the other differences. and what's mean by grey code.