Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379) i had cmpltd my diploma with 89% in ECE and i got call letter foe the interview of isro bengaluru which bks i hv ti prefer
2089If a Power Transformer Fails and the transformer manufacturer suggest that "Do all electrical test on the transformer?". What are the test to be conducted in this condition?
5 7523in the thermal power plant, why we use the condenser (for cooling the steam) when we have to heat the steam again. i mean why we are cooling the steam,
6 10659
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
we use capister for power factor. when we use capaciter in dg circuit than defect dg. can we use capaciter bank for dg circuit
why in a swquence network representation, the negetive sequence generated voltage is taken as zero?
How does the steam work in a steam turbine?
How DP Transmitter can be calibrated for crude application in floating roof tank
What is hertz in electrical system?
Explain the mechanism behind the turbine meter.
if 3400kw slipring motor rotor shorting done and motor started on mv drive ,what will be the rotor shoring current
tell me about accenture
In AC if the direction of current keeps reversing every half cycle, how does it propogate through the transmission lines?
I need to know the process to add 100 tapes in ATL. Ho to inicialize them to the system? How is all the process i need to follow> Thanks
Generation of voltage for each phase are same of a turbogenerator.Although the short circuit current flow when two phase of turbogenerator are shorted(where current can't flow without potential difference),why?
What is the purpose of the gap in the road on this bridge?
I need to know steps to Calibration Valve Guard......
what questions will be asked for 11/33KV licence interview APSEB hyderabad. Can any one share question and answers.