Do you have several alternative BOMs for a material, depending on the manufacturing procedure or lot size, for example (multiple BOM)?
1 4506What structure do your BOMs have? How many levels are there? How many components are there on each level?
1 6067Do your single-level BOMs represent production levels and do you keep your BOM header materials in stock? If not, do you produce non-stock items, or are some assemblies just used as structural elements in a BOM?
2 5330In which context do you use bills of material? [ ] Material Requirements Planning [ ] Execute Production [ ] Goods Movements (to Help Data Entry) [ ] Product Costing [ ] Development/Engineering/Design [ ] Documentation [ ] Others
4 8560in sap system, how to get production order record! example:i want to know who lock my production order!
5 14915If process order is technically closed, by mistake I want to process that order again can I do it?
6 12087If there are some errors in goods movements, and less stock of material consumed, how can i solve that problem in SAP.
3 10769Post New SAP PP (Production Planning) Questions
Difference between standard cost and variable cost.
What is Inspection Points?
What is the use of mrp group?
Mention what is the use of t-code cs20 in bom?
What is detail scheduling
How to attach a drawing for a material to bom ? Is it possible ?
Define mrp list
What are the key fields in MRP views?
list the important tables used in pp.
How you get the ticket?
What are all the steps involved in Variant Configuration?
Explain 'mrp' (material requirements planning)?
What is opening period?
what is group bom? Is it possible to attach the drawing for a material to bom? How?
Explain the mrp group and their uses.