what is the difference between PP and PP-PI? Which one is better and how? Please explain some body in detail.
IBM,
2 21554What is the difference between time ticket and time event confirmation and when they are used ?
1 13694Hi, I have run the standard cost estimate for one product. Can any one tell me the planning steps for 100 products. Sravan
2 8674Hi, Can any one tell me what we will do after the marking and releasing of standard price in product costing. Sravan
1 5749What is mean by Standard Value, Scheduling Margin Key, Production Version, Product Cost Collector, Control Key,Demand Management.
1 20702• What types of scrap can be maintained in PP basic data and how would they be considered during MRP repectively scheduling?
1 4357Post New SAP PP (Production Planning) Questions
How mrp (material requirement planning) types are classified?
define variable cost
Integration between PP and SD module.
You want to insert an inspection check point at the end of an operation. How would you do that?
What is Schedule Margin key. How floats works in scheduling?
Are there any reports in sap to list of material requirement from ltp ?
Tell some standard order types and what configure done for current project
What is golive actually? What is the role of a functional consultant in golive actually?
In om, how to get the details for a group of employees (ex.) Group of drivers in the organization?
what are Standard keys
Explain Availability check.
Where have we to specify the teardown time in one operation?
Difference between PP and PI.
What are the different type of BOM usage?
What is meant by payscale structure? How did you configure payscale structure?