We have a lot of size procedure here which is creating more order proposals. How do you set the limit value for the maximum number of mrp order proposals per date in img?
1095We are trying to create purchase requisition from mrp run. We have material, info record, source list, demand in place. Mrp is always creating plan order. Why?
1019If there are some errors in goods movements, and less stock of material consumed, how can we solve that problem in sap ?
957Post New SAP PP (Production Planning) Questions
What does a PP Consultant do in his/her real time?
How the processing time is calculated in a wc when both labor, machine categories exist?
What is planned consumption and unplanned consumption?
What is a ‘work center’ in pp?
Difference between base unit of measure, production unit, order unit
Difference between different strategy groups.
What do we do in the realization phase?
Suppose the client wants me the vacancy to be displayed on a website as well as ess. How should I do it?
How do I find which is the recurrent item in a production order? In the missing material analisys I got message MF 331, but the BOM or the production order don'thave any recurrent item Thanks
What is opening period?
what is std info set? where it is used?
• How are basic order dates determined?
We have two storage locations are ‘0001’ and ‘0600’. Default storage location in process order is always ‘0001’ what determines this default location?
What is 'capacity planning'?
What are all the settings done for configuring the integration of pp with fico?