explain BOM usage and status?
Answers were Sorted based on User's Feedback
Answer / rasika deshpande
By means of BOM usage, you can manage separate bills of
material for various internal organizational areas
(engineering/design, production, costing, and so on).We can
define different boms for the different areas of the
company, such as design dept, production, sells and
distribution etc. , depending on their individual
requirement. This can be done by choosing different usages
while creating the bom.
The BOM status specifies whether a bill of material is
active or inactive for different organizational areas.
it can be seen at header level of the bom.
Is This Answer Correct ? | 13 Yes | 4 No |
Answer / atul y
The bill of material usage specifies the departments or
functions within a company where the bill of
material is used.
The BOM status controls BOM processing in different
application areas
Example:
BOM X:
BOM with status '1' can be exploded in MRP and released for
a planned order.
BOM Y:
BOM with status '2' cannot be exploded in MRP or released
for a planned order.
Is This Answer Correct ? | 5 Yes | 1 No |
Answer / venkatesh
Bill of Material is the quantity details of each item used
for producing a finished product.
Is This Answer Correct ? | 1 Yes | 4 No |
What is MPS and difference between MRP and MPS?
What is the transaction code to run MRP for sales order?
What is the role of an administrator in pa?
What is the difference between “planned consumption” and “unplanned consumption”? Can safety stock calculation be done on either of these?
What is testing & explain standard testing
how costing is done in pp or how u will know the cost of a product which is manufactured in ur plant
cutover activities in sap
define the CRP,MRP,DRP ?
How are time management and payroll are integrated?
What is costing? How it is affected the pp?
what is the consumption based planning ?