Answer Posted / rasika deshpande
By means of BOM usage, you can manage separate bills of
material for various internal organizational areas
(engineering/design, production, costing, and so on).We can
define different boms for the different areas of the
company, such as design dept, production, sells and
distribution etc. , depending on their individual
requirement. This can be done by choosing different usages
while creating the bom.
The BOM status specifies whether a bill of material is
active or inactive for different organizational areas.
it can be seen at header level of the bom.
Is This Answer Correct ? | 13 Yes | 4 No |
Post New Answer View All Answers
Explain transaction code KO88 or CO88.
What are the production process in sap?
Explain Availability check.
Define standard cost
What is Material status and which view of the material master it is available?
Tell some standard order types and what configure done for current project
What is recursive BOM
Where we have to specify the teardown time in one operation?
Explain how can you create production order without routing and bom?
Difference between Item categories or what is variable size item or non stock item.
Explain the gaps and the steps involved in them.
How system calculate the actual cost?
Are there any reports in sap to list of material requirement from ltp ?
What is time phased Planning?
Why is work scheduling required for semi finished and finished products?