What is the quantity of cement, sand, and gravel to be used
in M20 grade of concrete for 1000 x 1000 x 1000 mm of sand
(for cement please mention in kilos, and for sand and
gravel please mention it in CFT)
Answers were Sorted based on User's Feedback
Answer / guruprasad
1000mmx1000mmx1000mm =1 mx1mx1m = 1cum ok
M20 Grade =1:11/2:3
summation of proportion=1+1.5+3=5.5
1.54cum of dry materials of concrete will yield only 1 cum
concrete after adding water.
1cum x1.54/5.5= 0.28 cum
so cement=0.28cum= 0.28/.0347=8.07 bags=403.5 kg
sand=4.2cum=15.036cft
aggregate=8.4cum=30.072cft
| Is This Answer Correct ? | 41 Yes | 14 No |
Answer / rajendra
1000mmx1000mmx1000mm =1 mx1mx1m = 1cum ok
M20 Grade =1:11/2:3
summation of proportion=1+1.5+3=5.5
1.54cum of dry materials of concrete will yield only 1 cum
concrete after adding water.
1cum x1.54/5.5= 0.28 cum
so cement=0.28cum= 0.28/.0347=8.07 bags=403.5 kg
sand=0.42cum= 14.82 cft
aggregate=0.84cum= 29.65 cft
| Is This Answer Correct ? | 26 Yes | 8 No |
Answer / reethesh.m.p.
1000mmx1000mmx1000mm =1 mx1mx1m = 1cum ok
M20 Grade =1:1.5:3
summation of proportion=1+1.5+3=5.5
1.54cum of dry materials of concrete will yield only 1 cum
concrete after adding water.So the constant is 1.54
Quantity of cement for 1m3=1 x1/5.5x1.54 = 0.28 cum
1m3 cement=1440kg. So cement for 1m3=0.28x1440=403.2 kg
sand=easy method=1.5xcement=1.5x0.28=0.42 m3x35.313=14.83cft
or sand=1x1.5/5.5x1.54=0.42 m3x35.313=14.83 cft
Coarse aggregate = 3xcement or 2xsand=(3x0.28) or (2x0.42)
=0.84cum x 35.313 = 29.66 cft
or coarse aggregate= 1x3/5.5x1.54=0.84 m3x35.313=29.66 cft
| Is This Answer Correct ? | 16 Yes | 7 No |
Answer / vj
the ratio for M20 1:1.5:3 is basically by weight
if we convert this into by volume then the ratio becomes 1:2:4.
thus for 1 m3 concrete cement = 0.12
sand = 0.22 and aggregate = 0.46 and water 0.18 = .98 m3 (.2 considered to be entrapped air)
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / k.raja
Correction in Question we made:
What is the quantity of cement, sand, and gravel to be used
in M20 grade of concrete for 1000 x 1000 x 1000 mm.
(for cement please mention in kilos, and for sand and
gravel please mention it in CFT)
1000mmx1000mmx1000mm =1 mx1mx1m = 1cum ok
M20 Grade =1:1 1/2:3
summation of proportion=1+1.5+3=5.5
1.54cum of dry materials of concrete will yield only 1 cum
concrete after adding water.
1cum x1.54/5.5= 0.28 cum
so cement = 0.28cum x 1440 = 403.5 kg
sand = 0.42cum x 10.47 = 4.40 cft
aggregate = 0.84cum x 10.47 = 8.80 cft
| Is This Answer Correct ? | 3 Yes | 10 No |
Answer / sjtbehera
1000mmx1000mmx1000mm =1 mx1mx1m = 1cum ok
M20 Grade =1:11/2:3
summation of proportion=1+1.5+3=5.5
1cum x15.4/5.5= 2.8 cum
so cement=2.8cum= 2.8/.0347=80.7 bags=4035 kg
sand=4.2cum=150.36cft
aggregate=8.4cum=300.72cft
| Is This Answer Correct ? | 17 Yes | 45 No |
pls can some one tell me details of coloumn shuttering like at what distance the supports should be palace and no. of supports
Dfine superelevation.it depends upon which of the following. 1.surface condition of road 2.width of road 3.radius of curve 4.speed of vehicle
which tie is used in binding of steel double tie or single ti?
significance of specific surface area of particles?
Define What is rigging?
WBM Road aggregates quantity calculation
what is c4x light weight cement blocks
The company is following same question pattern and giving same questions in all year for all batches from the starting of company they didnt even able to frame new question,,so guys if u want to place in cccl just mail me i will send the questions....ramyakvb@gmail.com....if u mug all those answers u will be selected no proper selction procedure is considered so it is better to place in some other company...All The best dont attend cccl
08. 4 main points about check list for Shuttering works are––– 4 i) ii) iii) iv) 09. 4 main points about check list for Concreting works are––– 4 i) ii) iii) iv) 10. 4 main points about check list for Plaster works are––– 4 i) ii) iii) iv) 11. 4 main points about check list for Brick works are–– – 4 i) ii) iii) iv) 12. 3 main points about Project delaying factors are––– 3 i) ii) iii) 13. Write down 60-grade M.S. deformed bar specification. 3 14. 3000 psi concrete means: 1 15. 4 main points about methods of wastage control are–– – 4 i) ii) iii) iv) 16. 1 main point about reasons for your honesty is : 1 17. Water cement mixing in hopper less mixture machine is better than hopper mixture machine because: 1 18. 2 main points about your role during roof casting are–––– 2 i) ii) 19. a. The weight of 3333m deform bar of 24.5 mm dia is…… 1 b. The weight of 300 rft plain bar of dia 1 is……. 1 20. The types of slumps are––– 3 i) ii) iii) 21. 4 main points about the causes of cylinder failure are––– 2 i) ii) iii) iv) 22. Detection of a beam & a girder are–––– 2 i) ii) 23. Curing is needed for–––– 1 24. The types of slabs in respect of size & shape are––– 5 In respect of size: i) ii) In respect of Shape i) ii) iii) 25. The types of Column in respect of size & shape are–– – 9 In respect of size: i) ii) In respect of Shape: i) ii) iii) iv) v) vi) vii) 26. 3 field tests & 3 Laboratory tests of bricks are––– 6 Field tests: i) ii) iii) Lab test: i) ii) iii) 27. 2 field tests & 1 Laboratory tests of sand are––– 3 Field tests: i) ii) Lab test: i) 28. 1 field tests & 1 Laboratory tests of M.S rod are––– 2 Field tests: i) Lab test: i) 29. a. The % of water absorbs by brick chips: …………… 1 b. The % of water absorbs by Stone chips: …………… 1 30. In respect of design: 5 a. The % of strength gains by concrete in 28 days= b. The % of strength gains by concrete in 14 days= c. The % of strength gains by concrete in 07 days= d. The % of strength gains by concrete in 03 days= e. The % of strength gains by concrete in 28 days without curing =
What are the tests to be conducted on cement?
how many brick sand cement require (1:5) 1 cum
what interested you in becoming a civil engineer?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)