what is scan time of PLC & in which factor scan time is
decide
Answers were Sorted based on User's Feedback
Answer / mprajaneb
Scan time depends on PLCs. In the timing diagram of PLC
execution we have three different times.
1. Input scan time
2. Execution time
3. Output scan time.
Input scan time the PLC receiving the data status from the
input peripherals.
Execution time is the time required to execute the program
or for scanning the rungs in PLC program.
Output scan time is the time required to send the results
to the output devices as per the execution of the program
rungs.
| Is This Answer Correct ? | 14 Yes | 1 No |
Scan time vary based on PLC models. Scan time means scannin
of ladder rungs in PLC program ( ONE time) for all the
rungs.
| Is This Answer Correct ? | 5 Yes | 4 No |
Answer / sanjana singh
scan time in plc is 10ms.
it depends on the length of programme.
| Is This Answer Correct ? | 0 Yes | 2 No |
How can a transformer test by megger?
IN MCCB AND MCB TERMINATIONS ARE IN-COMING ON TOP AND OUT GOING ON BOTTOM,IF WE TERMINATED INTERCHANGED TOP AND BOTTOM ITS WORKS?
why we measure output of transformer in kva?
Difference between rating factor of cable and derating factor of cable?
electrical knowelge
over frequency is the protection of turbine or alternator?
At present how many HVDC lines are there in india
18 Answers HAL, Infosys, KSEB, Kuntham,
In a running D.G set engine and Alternator is revolving at 1500RPM but no output in the terminal>>>>what to do?? someone told excitation problem ....please advice
does meager test perform on lightning arrester ? if doesn't then why ?
WHAT WOULD BE THE FORMULA OF WIRE GAUGE FOR A FULL LOAD CURRENT
derive DC RMS value for half wave rectifier?
(1)The demand for electricity , the amount of renewable generation available, the amount of fossil fuel generation available and the cost of the fossil fuel generation are shown in table below period(hrs) demand(MW) renewable (MW) fossil- fuel(MW) cost of fossil fuel(MW) 00.00 - 01.00 2000 1800 2000 30 01.00 - 02.00 2300 2500 2000 30 02.00 - 03.00 2500 2700 2100 45 03.00 - 04.00 2900 3100 2100 50 04.00 - 05.00 2700 2600 2500 45 05.00 - 06.00 2400 2000 2700 50 06.00 - 07.00 2200 1800 2000 36 07.00 - 08.00 2100 1600 2000 36 Assuming that the renewable generation incurs zero cost, determine an optimal generation schedule(specifying the amount of renewable generation and fossil fuel generation used in each period, the cost for each period and the overall cost for 8 hours.)
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)