what is scan time of PLC & in which factor scan time is
decide

Answer Posted / mprajaneb

Scan time depends on PLCs. In the timing diagram of PLC
execution we have three different times.
1. Input scan time
2. Execution time
3. Output scan time.
Input scan time the PLC receiving the data status from the
input peripherals.
Execution time is the time required to execute the program
or for scanning the rungs in PLC program.
Output scan time is the time required to send the results
to the output devices as per the execution of the program
rungs.

Is This Answer Correct ?    14 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

if a 3phase 100kva distribution transformer , 400 v,50 hz, 4-wire system is loaded at 160 k.w mostly 1-phase Lighting & Airconditioning split a.c load what will be the net effect on the power system in terms of voltage, powerfactor, current , efficiency of xformer

1472


how synchronous condenser is used in place of synchronous generator with out negotiating IEEE standards? Can i use 3 generators as synchronous generators and 2 generators as a synchronous condensers in an IEEE 14 bus system with out disturbing the standards?

1642


can we synchronize star system generators with delta system transmission line ? and how ?

2314


It is desired to flood light the front of a building 42 meters wide and 16 meters hig.Projectors of 30 degree beam spread and 1000 watt lamps giving 20 lumen/watt are availabl.If the desired level of illumination is 75 lumen/m and show a suitable scheme.Assume the cofficient of utilization, deprecitation factor and waste light factor are 0.4, 13 and 1.2 respectively.

2980


What is an order of a system.

731






What are n circles?

678


What is the difference between type1 and type2 relay protection co-ordination for motor feeders

1751


What should be current in the Primary and secondary side of 1000KVA (11KV Supply)Transformer.?

638


A 7 storey building has a floor area of 35,000sq.ft on each storey. On the ground floor 11KV electrical sub-station is to be erected. A load of 3kw for every 400sq.ft (p.f is 0.8) is proposed for each floor. fire pump 7.5hp, water pump 5hp, lift 2 nos, each 10hp and 20shop load of each shop is 5kw. calculate a. load each floor b. total load of building c. L.T feeders for aech floor and from transformer to main. d. distribution diagram e. capacity of sub-station/capacitor bank f. line diagram

2384


How calculated single phase induction motor req. Capacitor?

1126


what kinds of Transformer oil grade is better for power transformer ?

1180


what is static frequency converter?what is the function...of sfc...?

1763


How is the resonant peak, resonant frequency, and bandwidth determined from nichols chart?

669


how to calculate regulation constants for over head lines? and what are the regulation constant for raccoon conductor at different voltage level and different P.F?

1469


What is force on a conductor in a magnetic field ?

626