If the output of a 100kva, 415v generator is stepped up to
11kv with a 500kva transformer,can the transformer be
Loaded above the source generator loading?
Answers were Sorted based on User's Feedback
Answer / m.aqeel
no main thing is ur source so our system can bear only
source rated power.
Is This Answer Correct ? | 2 Yes | 1 No |
Answer / kushal parikh
Transformer can be loaded upto 5 times as generating source is 100kVA and transformer is of 500kVA. Other source can be added by putting it on same bus.
Let me know if i'm wrong.
Is This Answer Correct ? | 0 Yes | 0 No |
I am doing apprenticeship training at HT switch yard in NLC. How can i get electrical c license. ??? What r the rules for getting it as an apprentice? ??
how to calculate the lightning arrester conductor @ no of earth pits required
What are the Steps for Testing of 20MVA (make:-CGL) Transformer? How many Test we have to do?
What should be the voltage between Neutral and Ground in secondary side of the step down transformer (230 V to 110 V) with no load condition?
Why is a plain induction motor unsuitable for wide speed control?
Sir I hv to fix 20 ton ac how much electrical power need apply?
How to model "IF ELSE" statement in matlab simulink?
Why is copper a better conductor of electricity than aluminium?
what is meant by ceiling voltage, ceiling current?? pl reply asap
what is the working difference b/w softstarter and Variable frequency drive ?
What is the difference between synchronous asynchronous memory?
What is the difference between in Fourier series and Fourier Transform. and please tell me the difference between both of them and the why we use them in communication system?