Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


In site how we can identify one way slab and two way slab?

Answers were Sorted based on User's Feedback



In site how we can identify one way slab and two way slab?..

Answer / pratyush mohan jha

see reinforcement spacing. for distribution reinforcement
spacing is very high. we provide nominal reinforcement
subjected to maximum of 45o mm. then categorise it as one
way slab. otherwise two way slab.

Is This Answer Correct ?    34 Yes 82 No

Post New Answer

More Civil Engineering Interview Questions

why do we provide haunches in rcc box or underpasses?

0 Answers  


Minimum size of the particles of silt soil

1 Answers  


what is the diffrence between Specific gravity & Density??

3 Answers  


For 1cu.m how many bricks required practically

6 Answers  


How to avoid fly ash seed ball formations in the concrete mixer while mixing of raw materials for fly ash block manufacturing?

0 Answers  


what is the nomimanal size' os agg.'for reinforced concrete 2 th ph value of water to be used in conc. Shall generly be

5 Answers   RRB, Sail,


all rod lapping formula

3 Answers  


Quality control

1 Answers   NCCL,


i know that, the for calculating material required for concrete volume of concrete is taken 50-54 % more for wet volume. i have querry is that cement and sand volume taken more for making wet volume but in the case of aggregate why it is taken more there is no change in aggregate whether it is dry or wet.???? can you give me answer for this???

0 Answers   QRI,


Slump Values for works?

0 Answers   Aditya Constructions, SVS Constructions,


how to calculate the runner (2*3) qty in cft. the length is 8 feet.

6 Answers   CCCL, Gammon, Greenko, L&T,


which of the following scale is largest one 1cm=50m and 1cm=50km

5 Answers   KCC, PWD,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)