For example span will be 10' * 10'
Sheetsize 3'*2'
X axis 3*3=9'+1 feet plank throughout 10'=9+1=10'
Y axis 2*5=10'
Total number of sheet will be 15 and 1feet plank (10')
Prob will be provide in each 2ft
No of probs is 15.
| Is This Answer Correct ? | 2 Yes | 1 No |
Column is a compression member then why we provide reinforcement on column?
1 Answers Simplex, Thermax, Vihaan Group,
How to do rate analysis for concrete work including shuttering work?
0 Answers DBM, Techno Solutions,
WHAT IS PMB IN CASE OF ROAD PAVEMENT? WHY PMB IS PREFERED THAN ORDINARY BITUMINIOUS SURFACING?
how much required strength of cement concrete bricks(size 230x115x75mm)
Rectangular room is more effective than a square room because ––
for a column of size 400*230mm column reinforcement= 8-20x(cant write the symbol,i hope u guys undersstand,something like (fi) column stirups=8x@(4l) 230c/c 1)what does these mean 2)how to calculate quantity of steel for this column(ceiling height 11 ft)
Why Vitrified tile are getting pop up.
what is mean by design concrete
what is pile cap and why its used ??? why its provided in different shape
What salary do you expect? to a 10 yrs experienced civil engineer?
What is Well Point System in Dewatering
Deduction in length of reinforcement steel for bar bending
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)