Answer / mitali
IS codes revised in 2000 and the revision of IS code is
working stress to limit state methods means kg to
newtons... and more changes are there in IS codes
| Is This Answer Correct ? | 3 Yes | 2 No |
Answer / m.s.sathyajeth subramania raja
Is 456 has been revised in 2000. the revision made in this
the changing of grade of concrete.
| Is This Answer Correct ? | 2 Yes | 1 No |
Answer / m udaya sooriyan
Ist revision during 1978 and latest second revision during
2000
| Is This Answer Correct ? | 0 Yes | 6 No |
Answer / saravanan k
the minimum grade of concrete has been changed to M15
| Is This Answer Correct ? | 8 Yes | 23 No |
IS 456 is revised on 1978. i dont know the changes exactly.
but in the old IS 456(1964) the unit was KG/SQ.CM.
that means compressive strength is mentioned as
100kg/Sq.cm, after the revision it is mentioned as N/sq.mm
| Is This Answer Correct ? | 7 Yes | 27 No |
What you understand by building codes?
what will be the difference in compressive test results for a 150 mm cube, a 150 mm cylinder and a 300 mm cube
How to fix the reinforcement in footing shorter bar at bottom and longer fix at top.
why we put pocket in some structure instead of bolt.
how much quantity of tile placing can be finished by one mason per day?
How is calculate the cube molt
pls tell me , what is the water content
which is cost effective Steel Structural or Concrete Structure building?
If 600mm*200mm*150** size bricks comes 55 piece in one cubic meter then how many 230mm*115mm*75 bricks in one cubic meter
why we use for testing of compression strength concrete the size of specimen 150x150x150. why we are not using another dimension like 100x150x100 uneven dimension.
I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)