Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


what is the size of shuttering?????

Answers were Sorted based on User's Feedback



what is the size of shuttering?????..

Answer / mudassir

1220/2440

Is This Answer Correct ?    3 Yes 0 No

what is the size of shuttering?????..

Answer / girish kamble

1200mm × 2400mm

Is This Answer Correct ?    3 Yes 2 No

what is the size of shuttering?????..

Answer / kavipriya m

1000X750mm

Is This Answer Correct ?    1 Yes 4 No

what is the size of shuttering?????..

Answer / srinivasaram.r

600*900

Is This Answer Correct ?    2 Yes 7 No

Post New Answer

More Civil Engineering Interview Questions

WHAT IS PMB IN CASE OF ROAD PAVEMENT? WHY PMB IS PREFERED THAN ORDINARY BITUMINIOUS SURFACING?

1 Answers  


what is meant by Stagging?

3 Answers   Alembic, Shirke,


what will be the cost of thickness of 125mmor rcc measurement of 52x33.75 feet

0 Answers  


different type of formwork?

2 Answers   TUV SUD,


which type of test carrying on the cement & why

1 Answers   LG Soft,


what interested you in becoming a civil engineer?

3 Answers  


why steel stirrups in column have more spacing at center and less spacing at both ends??

5 Answers  


Explain about Sulphate Resisting Cement ?

1 Answers  


HOW MUCH STEEL REQUIRED FOR SLAB OF AREA 23'3"*18.3"? FOR SLAB HOW MUCH DIAMETER BAR WILL USE?

0 Answers   URC Construction,


What is the Roll of Water Bonding under VDF road?

0 Answers  


Difference between ton and metric ton

3 Answers   DHA, ECCI,


Cube tests of concrete are failed at 7 days and 28 days.What is your next action?

8 Answers   AppLabs, Parsvnath,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)