Normally test are done before installation and commissioning
of the transformer. The following test are done;
1. Visual Inspection
2. Insulation Resistance Test
3. Ratio Test
4. Vector Group Test
5. Magnetizing Current Test
6. Core Balance Test
7. Winding Resistance Test

Is This Answer Correct ?    38 Yes 3 No

What are the testing to be done before the installation of 1000 KVA Transformer?..

Answer / p m tamhane

Polarity Test also an important before loading

Is This Answer Correct ?    5 Yes 0 No

What are the testing to be done before the installation of 1000 KVA Transformer?..

Answer / rajan singh tanwar(j.k. cement

For Power
Transformers the
following Pre
Commisioning tests
are done:-

1.Visual Inspection
2.Measurement of IR
Value
3.Measurement of P
I Value
4.Measurement of
Winding
Resistance
5.Short Circuit Test
6.Oprn Circuit Test
7.Magnetic Core
balance Test
8.Voltage Radio Test
9.Oil BDV & Acidity
Test
10.Checking the
function of
OTI, WTI, OSR, MOG,
PRV
Relays
Last one for the
relay's testing but
it also comes under
transformer testing.

Thanks

Is This Answer Correct ?    3 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

Why are calling lagging power factor is a inductive load?

2 Answers  


how can we calculate air compressure capacity

1 Answers  


NGR? What is NGR?

14 Answers  


Do u know any one? how to find out in motor rated amps? formula?

0 Answers   Banking, ET,


What is fault level? How can be calculate the fault level?

1 Answers  






What is the following which is printed on electrical appratuses like AC21 ,AC 23 , etc ?

1 Answers  


what is mean by NTPC?,why didn't electric shock in train?

7 Answers  


I am abt to give IOCL intrv.Plz sir guide me for IOCL intrvw (Electrical).Which subject to be consider. questions are generally asked from which subject.Plz help me out.

0 Answers   IOCL,


how to estimate the breaker capacity of breaker,please give the one example( 6.6 kv breaker,800a)?????

2 Answers   Divis Laboratories,


How does the sensitive earth fault protection provided by cbct for motor can help in reducing the size of cable used to supply the motor?

1 Answers  


how to calculate micom relay earth falt time and current sertting

0 Answers  


While testing LA mast,What are the parameter limits ?

0 Answers   TATA,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)