What are the testing to be done before the installation of
1000 KVA Transformer?
Answer Posted / rajan singh tanwar(j.k. cement
For Power
Transformers the
following Pre
Commisioning tests
are done:-
1.Visual Inspection
2.Measurement of IR
Value
3.Measurement of P
I Value
4.Measurement of
Winding
Resistance
5.Short Circuit Test
6.Oprn Circuit Test
7.Magnetic Core
balance Test
8.Voltage Radio Test
9.Oil BDV & Acidity
Test
10.Checking the
function of
OTI, WTI, OSR, MOG,
PRV
Relays
Last one for the
relay's testing but
it also comes under
transformer testing.
Thanks
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
sir i have a car stereo system and there is jack on him so can u tell me a way to find out their power terminals on the jack or on the circuit board"
sir vizag steel ka junior trainee ka paper kitne number ka ayega
WHY RATING OF VCB NOT LESS THAN 630A
What will be the current drawn by HT motor, if low voltage is applied.. any formula to calculate the LT amps of HT motor.?
How we can calculate the consumption in kwh of motor on basis of kw @100% load, @50% load & @ no load.
How do I calculate/select Droop CT ratio for various capacity of generators?
What is dc current source? Differentiate between ideal and non ideal current sources?
The inventer is a battery, but if lost current at home u will turn on the fan but the is AC and inventer battery is dc . Then how the fan was rotating. What device Or machine in fan converst the Dc power to Ac power
Why AC current leads voltage in capacitor and how?
In aerodynamic turbines which element is NOT there a.stator b.compressor c. Fuel intake system d.fans
Can anyone tell me some hints about what type of questions are asked by the interviewer by an Electronics engineer when company is installing an IPP and wants a team of engineers?
what is the working principle of a DG Set, Alternator, & exiter
what is strip power factor?
How to select transmission line type (i.e. 11kv or 33kv) for new established industries
Vaccum circuit breaker