What is Partial Discharge test .Please specify that this
test can be test on 11/0.433 KV,630 KVA Transformer.
PD is localised discharge which happens within the insulation because of small air pockets formed during winding insulation is being done in workshop. A Ultra high frequency signal is injected at the terminals which detects the frequeny and magnitude of electrical dischages. These values halps us in dentifying healthiness of insulation of the equipment.
| Is This Answer Correct ? | 0 Yes | 0 No |
what is the transformer efficiency?
why make protection 85% of winding?
WHICH SUPPLY IS BETTER FOR 4 MW LOAD. 1)TO TAKE NEARER AVAILABLE 11 KV SUPPLY OR 2)TO TAKE 33 KV SUPPLY WHICH IS AVAILABLE AT 10 KM DISTANCE BY INVESTING NEARLY 50-60 LACKHS
Do you know the faults occurs generally in motors and how to rectify them?
how percentage impedence effect on the size of the power transformer?
how much value of resistance should connect to 15 kw, 6 pole 3 phase slip ring induction motor having RV-240, RA-42.
What is sink and source?
What difference between voltage and current
how the testing of CT OF 400/200/100 done in33/11 kv s/s
i want to know how to calculate the battery capacity based on the UPS . ex i want to run have one kva UPS Which should run 10 hours ? in that case how many batteries to be installed and what will be the AH Value .
what is mean by restructuring power system?
HOW DOES THE FAN REGULATOR CONTROLS ITS SPEED
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)