What is Partial Discharge test .Please specify that this
test can be test on 11/0.433 KV,630 KVA Transformer.
PD is localised discharge which happens within the insulation because of small air pockets formed during winding insulation is being done in workshop. A Ultra high frequency signal is injected at the terminals which detects the frequeny and magnitude of electrical dischages. These values halps us in dentifying healthiness of insulation of the equipment.
| Is This Answer Correct ? | 0 Yes | 0 No |
Upload data by LSMW via BAPI in SAP system.
Brushed alternator is also called dc generator ? its true or false ?explain it ?
Why 11KV/440V distribution supply use for Domestic use?
3 Answers Essar, Getco, Nissan,
what is upper impedance and lower impedance of a distance relay
A 11000/415V distribution transformer is fed 415V upon it's LT side,Do I get 11000V upon it's Primary side ?
what will be fault level of 11 KV , 2000 A ELECTRICAL SYSTEM?
whu does the power factor of diesel generator always be 0.8. please explain
effect of decrease in excitation?
we are going to install a solar PV site and how can we calculate PV Solar Panel Efficiency, can anybody tell me complete method for its calculation.
what is the use of Auto re-closer?
explain how hunting can be reduced in an alternators?
HOW TO DO GRID EARTHING IN INDUSTRIES FOR A PRODUCTION BUILDING
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)