what is meant by MIS report
Answers were Sorted based on User's Feedback
Answer / anshuman tyagi
Management Infomation System. It is used for View data in
one shot so that decision can be taken.
Is This Answer Correct ? | 24 Yes | 1 No |
Answer / linu t. mathew
Management Information System.
It is for the purpose of informing quantity/values/amounts,
actually used/done, to the management every month, not to
clients and all.
Is This Answer Correct ? | 15 Yes | 1 No |
Answer / mouneswar
management Information System
requerment of higher management to quatity/ values/amounts
Is This Answer Correct ? | 1 Yes | 3 No |
MIS- Means Management Information service.
Is This Answer Correct ? | 3 Yes | 7 No |
How to calculate the no of bags required for 12mm thick 1:6 plastering?
57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13-9, 13-10, 13-09 Bottom Length - 13-11, 13-10.5, 13-10 Top width - 8-7.5, 8-8, 8-7 Bottom width - 8-7, 8-8, 8-7.5 Depth - 2-0, 1-11.5, 1-10, 1-11, 1 -10.5, 1-11.75, 1-11
what is meant by sustainable developement as far construction field is considered. Give suitable examples to explain the same
how quantity of much blocks, cement and sand is required to complete 1sq.m of CC Hollow blockwork
why the cube depth is 150 mm which is used for testing
GIVE US DETAIL OF YOUR PRESENT EMPLOYMENT STATUS?
What is meant by 'zero value' in quantity surveying.
10 Answers DLS, Gammon, HCC, NCC,
Formula of area of crane hook
Can anybody help by describing each and every step in short, used while giving a building layout by total station? Regards
100 cubic meter of concrete will contain how much amount of cement, sand and aggregate to form a mix of M15
What is reinforced brick masonary and its advantages and applications, arrangement of steel
what is the wet quantity of concrete?