Answer / anshuman tyagi
Management Infomation System. It is used for View data in
one shot so that decision can be taken.
| Is This Answer Correct ? | 24 Yes | 1 No |
Answer / linu t. mathew
Management Information System.
It is for the purpose of informing quantity/values/amounts,
actually used/done, to the management every month, not to
clients and all.
| Is This Answer Correct ? | 15 Yes | 1 No |
Answer / mouneswar
management Information System
requerment of higher management to quatity/ values/amounts
| Is This Answer Correct ? | 1 Yes | 3 No |
MIS- Means Management Information service.
| Is This Answer Correct ? | 3 Yes | 7 No |
tensile strength of shuttering ply wood=?
how to design mix ratio for concrete using M25?
i have to give lap joint fo 1Mtr steel of dia12mm,whenever i did mistake i cut less 5cm plz tell me how much i will give lap joint so that length comes 1Mtr
0 Answers National Construction Authority,
Do you expect there to be many jobs for civil engineers going into the future? What are the three main drawbacks of being a civil engineer? What are the three best things about being a Civil engineer? What amount of vacation time is available to you? Is the time paid? What are the usual hours of work required? Is it possible, or common, to work from home? How much time do you spend on the site of your projects? What type of schooling is required to be a civil engineer? How many years are required to complete this education?
How can I make justification between using concrete grade c35 compare c37?
What is Architect-Prepared Contract?
How many cement bags of 50Kgs will be required for 2600sqft terrace with thickness of 5".
What will be weight of 0.5mm GI sheet per sq.ft?
how to convert kg/m3 to cu ft
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
what is the clear cover for shearwall?
WHICH KIND OF ADDITIONAL PILE DRIVEN TO INCREASE THE CAPACITY OF SUPPORTING LOADS ON VERTICAL PILES
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)