what is the out turn of one masson in plastering, masonary
work in 8 hours, with limited healper?
what is the out turn of corpender in form work? wood work?
in 8 hour with limited healper?
what is the out turn of bar bendarin 8 hour with limited
healper for slabs, beams, coloumn?
Answers were Sorted based on User's Feedback
Answer / ravi
1)150to180Sft or14 to 16 Smt 2)formwork 600Sft of roof
shutering
or 112 Sft of plain door shutering
3)slab 1200Sft
beem 1.2 Ton
column 1.3 Ton
Is This Answer Correct ? | 11 Yes | 7 No |
Can we use Polystyrene as a Bitumen modifier !! if so is it a good MS research topic ? and what type of laboratory tests will be conducted during Research work ??
in a building what is the thickness of a wall in metres? dafault wall value?
What is change order request?
Clarify the out turn of steel fixer in construction field
Compressive strength of concrete
5 Answers B L Kashyap, Era Infra Engineering,
Process of pcc in wateredug
how to calculate steel quantity in plinth beam&footing
how to create our resume?
0 Answers Sunraj Construction,
How can i find number of brichs required for given quantity of wall in m^3..
5 Answers vasanth construction,
What should be percentage of silt content in sand?
What is the percentage of wastage in steel reinforcement n how to control it?
wat is the size of fine aggregate & coarse aggregate?