Answer Posted / jayshankar dwivedi
Management Information System
| Is This Answer Correct ? | 90 Yes | 3 No |
Post New Answer View All Answers
Explain the benefits of using standard terminology in the measurement process?(Tendering and estimation)
i have a interlock pavement work.i need to compact about 2000 sq metres of sub base grade c of thickness 15 cm.what is the amount of water required for compaction ??
How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)
what is stressing
load combinations how many types for staad design purpose?
What is the thickness of slab for 600 sq each) 2 slab construction. What should be the size of steel rod?
I need to constructive work in amaraj batteries
What is the meaning of soil reinforcement?
in the earthquqke the profile of water on dam is parabolic or not
What is the purpose of Chipping in the heavy foundation?
Cement consumption of one cubic meter of aerocon blocks masonry?
660 square fit two story house make totally how much cement, sant, brick,aggregate, steel totally how much need
What is the density of 1:1.5 (Cement:sand) ratio in plaster? And Conversion in 12.5 mm thickness per square meter? Howmany Kg of Cement square meter in ratio of 1:1.5?
significance of specific surface area of particles?
How do you measure water flowing through 300mm diameter pipes?