what is the functional requirement of cement plaster in RCC
members & masonry??
Is it Manditory to do plastering on all RCC members(beams,
Columns, Slabs)?
in what places plasterring could be kept as an optional
one???
Answers were Sorted based on User's Feedback
Answer / bala
1.For Architectural work(neat & good appearance),
weathering coarse etc.
2.Not required.
3.Above falls ceiling, industril structure ,coar wall,stair
wall, techinicl galary, pump room , all service rooms etc
(cost controle can also be done).
| Is This Answer Correct ? | 4 Yes | 0 No |
Answer / mohammed mohiddin
1.
a> To prtect the structural or any masonary members from
weathering agent.
b> To impart aesthetic look by giving sophisticated
finish.
2.
It is advisible as an additional protection cover for
the RCC cover especially in the region where the members
are exposed to saline weather in coastal area.
3.
a> Where the good finishing is not required
b> Where the economical building required as mentioned
above
| Is This Answer Correct ? | 2 Yes | 0 No |
What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?
Why is DPC not provided at sills of doors?
why steel is used in r.c.c why steel is used in r.c.c
How much cements bag (or in KG) required for 1 Sq. M concrete, for M-30 grad concrete as per CPWD and where is thr proof on site
find the discharge of water through a horizental venturimeter having 400mm dia at the inlet main and 150mm dia at thorat.if the diffrential gauge between inlet and thorat shows a pressure head of 25cm mercury. assume coefficient discharge 0.98 and specfic gravity of mercury as 13.6.
how to calculate quantity of cement,sand & aggregate for u.c.r / r.r masonry in cm 1:6
Cemen-1 Fine agr.-2 Core agr.-3 calculate for per 100 qube feet (qubic feet wise)
Difference between wbm and gsb in road construction
4 Answers CPWD, GSB, Ircon, JMC Projects, L&T, RD,
How many kilograms of 12 mm coarse aggregate required in cufic feet for one cubic meter of M25 grade concrete
pls give me ans to ACT formula cube testing porpuse
what will be the quantity of following materials in P.C.C for the total area of (100'x70'x 0'4") 1)NO. OF CEMENT BAGS 2)SAND IN CU.FT 3)METTLE IN CU.FT
0 Answers Pratibha Industries,
what will do when 7days concrete has failed and structure has constructed?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)