Answer Posted / ram khapekar
MIS- Means Management Information service.
Is This Answer Correct ? | 3 Yes | 7 No |
Post New Answer View All Answers
How much form and scaffolding per cubic meter volume of concrete class ''A'', ''B'', and ''C''
What are segregation and bleeding?
Differentiate first angle & third angle projection?
what is directivity effect?
suppose we have a tendency to make a hole on the surface of the simple supported beam, than where we goes to make it?
where can i get the previous question papers for rrb section enginerr (civil)
In earth work 1300 cum soil how to calculate how many liters require in water
Define What is an ice dam sock?
what is the Asfalt test?in road constraction..?
what is the permanent solution applied for restoration of leaning tower of pisa?
will fix foundation bolts at site with out template is there any procedure?
how to calclate the SHUTTERING TAKEN CONCRETE LOAD? WHAT IS THE LOAD BEARING CAPACITY IN STEEL SHUTTERING PLATE? WHAT IS THE CONCRETE LOAD IN (MASS) IN THE SHUTTERING PLATE. PLATE SIZE IS 120CM* 90CM CONCRETE WALL LENGTH IS 10M ,WIDE IS 60CM, HEIGHT IS 1.2M PLS TO SENT THE CALCULATION.
in plate load test what is the thickness of plate 20mm 5mm 50mm none
Define angular dimension?
How to check slab shuttering level.? Or check list for slab ?