Answer Posted / linu t. mathew
Management Information System.
It is for the purpose of informing quantity/values/amounts,
actually used/done, to the management every month, not to
clients and all.
| Is This Answer Correct ? | 15 Yes | 1 No |
Post New Answer View All Answers
TO CONSTRUCT A 1800 SQFT CAPACITY UNDERGROUND WATER TANK HOW MUCH CUFT CONCRETE IS REQUIRED AND HOW MUCH REINFORCEMENT IS REQUIRED. FOR COSTING
Who built the sears tower?
what is education Cess.
How to calculate the area in squarefeets ?How much area of sqft for this measurements?East 53.3ft West 54ft North 47.7ft South 51.1ft ?
Required concret Surface Temperature prior to coating of epoxy pain with references ASTM or ACI whatever
Why is concrete cube test carried out?
how do we design mix ratio?
What is the use of offset command?
What are the main reasons for conducting pull-out tests for soil nails?
what is project?
20mm thick sand face plaster on walls consisting of 12 mm the backing coat of c.m.(1:3)and 8mm thick finished coat of c.m.(1:1)including scaffolding, watering, finishing etc complete please calculator with methyl et et r u
Would you cause a 55-gallon drum of water to weigh more by climbing in?
What is Gsb tollens ?
What are the techniques to measure road difference?
List out some of the software program that can be useful for architect?