Explain 'mrp' (material requirements planning)?
No Answer is Posted For this Question
Be the First to Post Answer
We want the system to run a single level mrp automatically on receipt of sales order. How to configure triggering event based mrp?
What is Backflush, the places where the backflush is used?
What is meant by payscale structure? How did you configure payscale structure?
Can’t one material be assigned to more than one operation in a routine?
What is the data you give in S.O.P screen?
What is the use of QM control key?
Integration between PP and MM Module.
Mention what is the use of t-code cs20 in bom?
Explain the mrp list and their uses.
Difference between NETCH, NETPL and NEUPL.
Explain what happens to planned after it has been converted into production order?
What is a ‘bom’?