How can I transfer the goods as consignment from plant to
another plant ? Which configurations or set up should I
maintain ?
Answers were Sorted based on User's Feedback
Answer / sam
Consignment goods cannot be transferred from one plant to
another. Say you wanted to move the consignmnent stock at
Plant A to Plant B, then the stock should be first moved
from consignment to unrestricted stock.
Is This Answer Correct ? | 22 Yes | 6 No |
Answer / muraleedhar bathula
first we should trasfer posting the stock from vendor
consignment to unresticted stock by using mvt 411k and then
stock transfer by using mvt 301 or 303
Is This Answer Correct ? | 13 Yes | 2 No |
Answer / saramara
T Code - MB1B
Material Trans to One Plant to Other Plant.
Movement Type - 301 ( one step)
Movement Type - 303 ( two step)
Is This Answer Correct ? | 18 Yes | 12 No |
Answer / manoranjan
zvlmove usr the t code transfer goods one plant to another
plant
Is This Answer Correct ? | 3 Yes | 5 No |
What is the procedure to make the period indicator in the mrp2 view as “p”?
Is there any difference between "Blocked Stock" and "GR Blocked Stock"? I read that: GR Blocked Stock is always non-valuated, while Blocked Stock inventory can be Valuated. Is this true? Please explain this while answering if the two terms are same or different.
If I recieved Change request then how I can Process further this request or how to release the request?
What are the settings required for quota arrangement?
What is the procedure to delete materials permanently from material master?
Hello SAP MM trainers,I am a SAP MM consultant working for MNC in Hyderabad, India and have good experience in domain and SAP MM. I am being forced by my company’s client to show them my SAP MM certification. Now my company is insisting me to write the certification exam. I can write the exam without going to SAP certified institute as my company is SAP partner, but I am not confident that I will pass the exam. As I am working odd hours and family commitment, I do not want to go to SAP certified institute. I am looking for a trainer who is experienced in real life projects (not a full time trainer with bookish knowledge) and certified in SAP MM and willing to train me in couple of weeks so that I can pass the certification in first attempt. Please email sapmmexam@gmail.com
What is meant by MRP Type and lot sizing?
what is the difference between credit memo and subsequent credit memo
how many no of release strategies can be assigned to purchasing document like PRs and POs?
What are different ways to do physical inventory in sap?
Tell me about the various movement types and usage.
What are the mrp procedures available in mm-cbp (consumption based planning)?