Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


WHY FLEXI LINKS ARE USED INBETWEEN GENERATOR TERMINAL
OUTPUT & BUS DUCT CONDUCTOR.

Answers were Sorted based on User's Feedback



WHY FLEXI LINKS ARE USED INBETWEEN GENERATOR TERMINAL OUTPUT & BUS DUCT CONDUCTOR...

Answer / surender singh

In output of Generator terminal and Bus duct ,we use flexi
links ie no hard connection because to avoid the transfer of
vibration of generator to bus duct.

Is This Answer Correct ?    12 Yes 1 No

WHY FLEXI LINKS ARE USED INBETWEEN GENERATOR TERMINAL OUTPUT & BUS DUCT CONDUCTOR...

Answer / shali

That have also something to do with avoiding high tenssion
on the generator terminals due to the physical weight of
the hard busbar. Plus, limiting the transfare of the
generator vibe to the bus.

Is This Answer Correct ?    1 Yes 0 No

WHY FLEXI LINKS ARE USED INBETWEEN GENERATOR TERMINAL OUTPUT & BUS DUCT CONDUCTOR...

Answer / mi2

to avoid vib. of generator, & work as like fuse

Is This Answer Correct ?    2 Yes 4 No

Post New Answer

More Electrical Engineering Interview Questions

11kv has three live wires how much voltage is in its single wire(leaving the other two wires)

13 Answers   Power Grid,


what is the advantage and disadvantage of billing in kwh and kvah by electricity board .

6 Answers   Nespak, NTPC,


What is EHT(Abrebiation,Function,Voltage Regulation & how it works?

2 Answers   Adhunik,


Why frame of the motor is specified?. If we mention KW and voltage level,automatically frame is decided or separately frame is compulsory to mention?.

0 Answers   DAE,


is the surge effect the solar panel, if yes so tell me how can surge effect the panel? explain brifly

1 Answers  


If we tell 60 sq.mm. 3-1/2 core cable,then what does it mean ? 1) Each core section in the whole cable is of 60 sq. mm. 2) The whole cable is of 60 sq. mm. which is sub-divided into 3-1/2 core.

3 Answers   Cura HealthCare,


why we use 20 KV, 10KA LA on 22 KV Line

2 Answers  


What do you mean by an instrument transformer?

0 Answers  


In which connection the distribution T/F is connected? a) &#9650; / Y b) Y / &#9650; c) &#9650; / &#9650; d) Y / Y

4 Answers  


Why are the cores of large transformers built up of circular transactions ?

0 Answers  


What are conduct on the testing in cf in ur site?

0 Answers  


Hi Friend I am used multimeter to measure the voltage between R Phase(SS1) to R Phase(SS2). In SS1 is connected with UPS loads. But I am getting voltage between these 2 R Phases. Please give some idea friend

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)