Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


how much quantity of cement and sand required for
construction of 10 cum brick work( Brick size
3"*4"*9"(Standard size ) an d for 10 cum construction of SSM
(Size stone masonary) with Cm 1:6 for both.

Answers were Sorted based on User's Feedback



how much quantity of cement and sand required for construction of 10 cum brick work( Brick size 3..

Answer / santhosh

for 1cum ssm
brick size 0.075m*.1m*.23m = 0.0017cum
there are 550nos of bricks need for 1cum of ssm
therefore = 550*0.0017cum =.935 cum of bricks in 1cum of SSM
so, CM = 1-.935 = 0.065 cum
Cement sand ratio 1:6 = 1+6 = 7
cement = 1/7*1440*.065 = 13.37 kg
sand = .065 cum

for 10 cum
cement = 134kg
sand = .65cum

Is This Answer Correct ?    65 Yes 103 No

Post New Answer

More Civil Engineering Interview Questions

What is the life of reinforcement?

3 Answers  


what is the average steel consumption in multy storey building as a residential and commercial?

6 Answers  


what is void ratio??

3 Answers  


what is density on steel bars?

3 Answers   AICL,


what is stress

5 Answers  


where do Tie beams used in foundations?

1 Answers   Architects,


Describe the role of independent Quantity surveyor?

0 Answers  


how many bricks are consumed for 01 Cum of brick work

10 Answers   Fusion, IVRCL,


why the openings of sieves are square io size?

0 Answers  


Explain Different types of raft foundation

1 Answers  


How to calculate the quantity of water in cement mortar eg. CM 1:3?

3 Answers  


How much concreat we make by 1 bag cement? (ratio- 1:1.5:3 or 1:2:4)

2 Answers   Castles Consulting Engineers, KCP, Opaque Infrastructure,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)