Answer / virendra kumawat
in M20 Grade(1:1.5:3) concrete make .125 Cubic meter and M15 grade(1:2:4) concrete make .21 Cubic meter.
| Is This Answer Correct ? | 3 Yes | 2 No |
What is the difference between Normal Concrete and High density concrete?
How much Strength of the cube can attain in 7days comparative 28 days strength?(as per IS code) ( specify the ref.clause also)
what is meant by hidden beam & purpose of hidden beam
2 Answers Carwell Construction, NTDC,
What is the exact meaning for under & over reinforced beams & when they have to used..
11 Answers Gammon, L&T, MEIL,
why did you choose this career
what is the water cement ratio for plastering
What is a MIS report?
what is workability,define it?
What is the amount of cement,sand and course aggregate(jully)(in kgs) required for the RCC of an area of 450 square feet and 5 inch depth if the concrete mixing ratio is 1:2:4(cement:sand:jully)?your answer will be very helpful.
how many bricks are required for masonary trench having length of 31 mtr, depth of 0.6 mtr and breadth of 0.45 mtr on single brick work as well as double ( 9" ) brick work
what are the five benefits of using standard terminology in the measurement process?
how to calculate steel for slab or footings?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)