Describe the role of independent Quantity surveyor?
No Answer is Posted For this Question
Be the First to Post Answer
how ratio is calculated for any grade of concrete. for e.g. sppose M20 requires(x;y:z) quantity of cememt sand and aggregate.
In case of columns the cover is from main steel or from stirrup & which is the IS code mentioned in it?
Whta is the proportion of M30
100sqft of 9" (brickwork).. bricks(standard)=no ? sand= cement=
What is kn measurement?
how to calculate concrete qty for footing using M25 grade 1:1:2 for 731 cft.
9 Answers Abuilding Lab, L&T, MPSC, Vellapally,
How to calculate the volume of sloped isolated footing?
one litre of shuttering oil how much area covered the shuttering?
time and work questions
How much quantity of water required for curing of: 1) For concrete of 10cu-m or 10sq-m 2) For blockwork of 10sq-m 3) For plastering of 10sq-m
How much cement,sand,bricks and water needed for 1square metre brick work?
what are RIB slabs explain about it
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)