What is the importance of Form B to state Electricity
Boards?
Answer / k.prakashchandra
It is the form for seeking approval from electrical
inspector to charge /commission a new HT line
Is This Answer Correct ? | 3 Yes | 0 No |
Isolation transformer primary to sec turns ratio?
why it is important to earth neutral of 3 phase transformer?
9 Answers IBM, ITC Indian Tobacco Company, RRB, UDS,
why phase to phase voltage is 400v while phase to neutral is 220v?
HOw can we calculate power factor at HT side.
what are the protections used in power transformers of 5 mva and above
The advantage of free wheeling diode in a Full Ware rectifier is -reduces the harmonics -Supplies the voltage at negative vlotage
What happen if 200 KVAR capacitor connected to power continuesly?
What can make the the overloads operate when a star delta three phase motor starts?
1.what is bus cuplour and main funtions. 2.what is main function of alternator. 3.how many types of dg oils.
how many types of ratings are there of transformer
can anyone help me regarding bout Electrical designs and calculations .. which text book should i follow as i am a trainee engineer.Description of my work which is Electrical designs like cable sizing, lighting, lightning, Gensets sizing, motor sizing, transformer sizing, generator sizing, circuit breakers, PDB MCC PCC SLDB MLDB panels, Single line diagrams mainly, substation desings, cable routing and layouts, reactive power compensations, power factor improvement, voltage drop calculations, power generations, power transmission, power distributions all calculations.Please help me
We are preparing another project which involves Waste heat recovery from a 1 MW GE Engine. The Engine in particular gives out flue gas at 487Deg C with a flow rate of 5650 kg/hour and this can be cooled to 180 Deg C. This gives a thermal output of ~ 594 KW that is available for input to VAM via heat exchanger / boiler. Additionally 581 KW will be available from engine jacket water (temperature profile 80/ 80 Deg C and a flow rate of 50m3/hr) Our estimation is that 300 TR of cooling is possible with a suitable VAM machine(s). Please advise what is the most suitable arrangement with maximum TR and min Capital expenditure. plz reply me as early as possible