DG B-check,C-Check,D-check is depending upon the running
hrs.If the running hrs is not reached as mentioned.How to
conduct the DG checks.
Answer Posted / sharath patel
if the running hours not reached means we can conduct the
checks by the number of days from the comissioning date.
| Is This Answer Correct ? | 7 Yes | 9 No |
Post New Answer View All Answers
What are the different types of dams?
what id a dry type transformers and its function ?
why asa method ZPF method is more accurate than ASA method?
Is it posible to instal one more SMDB from the existing SMDB and is it practical.
Electromagnetic torque developed by the motor is compared to shaft torque. A less B same C depends on motor design D more
what is the defination of Cable database? What are the points are considered while preparing cable database? Is there any sample available for cable database?
Why current shoots up in the secondary on the knee point voltage during saturation test of CT? How core saturation effects the secondary current (while the primary side is open)? What the logic behind this?
Define load factor?
What is earth?
where is core-type and shell-type construction suitable for transformers ?
what is the meaning of 0.5ohm Resistance
what questions will be asked for 11/33KV licence interview APSEB hyderabad. Can any one share question and answers.
In what cases (circumstances)we should apply P controller, PD controller, PI controller & PID controller ?
why we are not giving the zone 1 trip command to the master trip relay
What are the advantages of instrument transformer?