Answer / shri..
Major thing in c check is that gap in between inlet valves
& rocker has been check & maintain, the end clearance of
crank shaft has been check & maintain. + B check also
carried out in c check.
| Is This Answer Correct ? | 24 Yes | 7 No |
C check is carried out along with A & B ,
B checks
Coolant level
Oil filter replacement.
Fuel filetr replacement.
Alernator terminals tightness checking.
Replacement of lubricating oil....etc
C checks.
Coolant level replacement.
Check the fuel injectors etc..
Its depends on the size of the DG sets , auxillary
system,freuency of mainttenance ...
| Is This Answer Correct ? | 18 Yes | 2 No |
Answer / yuvaraj
Taper shaft in a crank has to check, cylindrical block
surface to check and + B check also carried out in c check
| Is This Answer Correct ? | 12 Yes | 2 No |
Answer / sanath shetty
C-Check is done in (Every 800-1500 Hrs.)
following are the checks
1. Change oil.
2. Change oil filter,fuel filter,bypass filter.
3. Change Air Filter.
4. Change water Separator
5. Radiator cleaning with chamical
6. Check All Electrical terminal & thimbles
7. Check polution level.
| Is This Answer Correct ? | 9 Yes | 2 No |
How to calculate Voltage regulation of 22 KV Over head Line.
in 132kv substation CRT means
i am going to correct power factor of 1600kw induction motor,when i calculate capacitance of capacitor it is three time more in star connection than delta. if motor is star connected which connection i shall adopt for capacitors and reason for adopt this connection
why some transmission lines have 7 wires n why some have 3 n 4??
What causal system?
power is the product of voltage and current.so we can measure the value of power just by using ammeter and voltmeter.......then why do we use a wattmeter?
What is Load sharing of Transformer ?
Draw the DOL starter and star delta starter drawing?
is there or does RCCB work for single phase connection?
without name plate detail of blower how we can find out the HP & Rpm ? the input voltage is 230v single phase
Tell me all plants load factors i.e which plant operating on which load?
What are the Formula of computing Back up Time of 500kVA UPS with 4 Battery Banks, each bank composed of 43 pcs of Batteries 12V150Ah. How to compute the Back up Time of UPS? We have also 3X500kVA UPS running in Parallel same composition as I write above.
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)